- Get my office set up
- Finish Hist Eco syllabus/readings
- Finish 8 Hist Eco lectures
- Fall planting
- Finish gutters
- Make rain barrels
- Get the vent from bathroom to roof done
- Finalize advertising postcards:
- design/text
- order
- mailing list
- ArcGIS tutorial
- One small Pen and Ink drawing, and fool around with brush painting again
- Get fence installed
- Get 3 epees working
------------------------------------------------------------------- DONES
- Flowerbeds installed:
- install beds
- load dirt
- plant
- Finish Env Arch syllabus
- Get driveway finished (I think its as finished as I want it for now)
DONE*Finish paper/presentation for workshop
- Apply for 3 Jobs (3/3)
- DONE!!! Have 2-4 people over for dinner 3 times (Andy and Heather, Tom and Elizabeth, Joel and Peter 3/3)
- DONE!!! Buy a second car (or a first car since the car one died a final death)
- DONE (sort of) Finish 2 new syllabi (ASAP) (1/2)
- DONE!!! Finish Pen and Ink Class Homework (By Sunday Dec. 6th)
- ✔ finish didging one map